Now that the power plant is in place, we are focused on installing all the peripheral equipment. We are making an effort to getting this car running in a week or so.
I began the day by attaching the generator. The bracket shown on top of the generator is for the coil.
The black canister shown in the photo to the left is the reservoir for the hydraulic brake and clutch systems. Notice the label. It is the correct decal for the reservoir.
After the slave cylinder that operates the clutch is connected, both systems are ready to be "bled". At that point, we can stop the car but we still can't make it go.
Life is good,
Big Healeys are BAD !
Tom McCurry